'
CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR MISSION_NAME = MARS_GLOBAL_SURVEYOR; SPACECRAFT_NAME = MARS_GLOBAL_SURVEYOR; DATA_SET_ID = STATUS_REPORT; FILE_NAME = INSTRPT_MAG_20001106_000000; PRODUCER_ID = MGS_MAG_TEAM; PRODUCER_FULL_NAME = "MONTE KAELBERER"; PRODUCT_CREATION_TIME = 2000-11-06T18:30:00.000; END CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ MAG TEAM REVIEW: This MGS MAG/ER status report covers the period: 29 October - 4 November 2000 (DOY's 303-309) MAG/ER instrument temperatures, currents, and voltages are within nominal ranges. A gif plot of the instrument parameters for the week is located at: http://mgs-mager.gsfc.nasa.gov/status/sr00303-309.html Previous status reports for the magnetometer and electron reflectometer instruments can be selected for viewing at: http://mgs-mager.gsfc.nasa.gov/status/index.html The plotted quantities are: MCP_V-->micro-channel plate voltage A_MA--> controller current A_TEMP-->controller temperature ER_TEMP-->ER temperature IB_TEMP-->inboard temperature OB_TEMP-->outboard temperature No MAG/ER NIPC's were radiated during this period. Large gaps occurred on DOY's 304, 306, and 308. The first gap in DOY 306 is due to DSN problems (based on the DSN status report). The first gap in DOY 304 and the second gap in DOY 306 are unexplained. The second gap in DOY 304, the gap in DOY 308, and the third gap on DOY 306 occur at the end of the day and are assumed due to the scheduling conflicts associated with playing back partition 7. $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA
Last Modified: Mon Nov 6 13:43:12 EST 2000
Curator: Monte Kaelberer, Raytheon
Email: Monte.S.Kaelberer@gsfc.nasa.gov
Responsible NASA Representative: Mario Acuņa
Email: Mario.H.Acuna.1@gsfc.nasa.gov