'
CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR MISSION_NAME = MARS_GLOBAL_SURVEYOR; SPACECRAFT_NAME = MARS_GLOBAL_SURVEYOR; DATA_SET_ID = STATUS_REPORT; FILE_NAME = INSTRPT_MAG_20001204_000000; PRODUCER_ID = MGS_MAG_TEAM; PRODUCER_FULL_NAME = "MONTE KAELBERER"; PRODUCT_CREATION_TIME = 2000-12-04T19:20:00.000; END CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ MAG TEAM REVIEW: This MGS MAG/ER status report covers the period: 26 November through 2 December 2000 (DOY's 331-337) MAG/ER instrument temperatures, currents, and voltages are within nominal ranges. A gif plot of the instrument parameters for the week is located at: http://mgs-mager.gsfc.nasa.gov/status/sr00331-337.html Previous status reports for the magnetometer and electron reflectometer instruments can be selected for viewing at: http://mgs-mager.gsfc.nasa.gov/status/index.html The plotted quantities are: MCP_V-->micro-channel plate voltage A_MA--> controller current A_TEMP-->controller temperature ER_TEMP-->ER temperature IB_TEMP-->inboard temperature OB_TEMP-->outboard temperature No MAG/ER NIPC's were radiated during this period. Several gaps occurred: The gap at the end of DOY 332 is assumed due to the scheduling conflicts associated with playing back partition 7. The gap on DOY 334 is unexplained. The gap on DOY 335 is due to DSN problems (based on DSN status reports). $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA
Last Modified: Fri Feb 23 15:55:10 EST 2001
Curator: Monte Kaelberer, Emergent
Email: Monte.S.Kaelberer@gsfc.nasa.gov
Responsible NASA Representative: Mario Acuņa
Email: Mario.H.Acuna.1@gsfc.nasa.gov