CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR MISSION_NAME = MARS_GLOBAL_SURVEYOR; SPACECRAFT_NAME = MARS_GLOBAL_SURVEYOR; DATA_SET_ID = STATUS_REPORT; FILE_NAME = INSTRPT_MAG_20010205_000000; PRODUCER_ID = MGS_MAG_TEAM; PRODUCER_FULL_NAME = "MONTE KAELBERER, EVER GUANDIQUE"; PRODUCT_CREATION_TIME = 2001-02-05T20:20:00.000; END CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ MAG TEAM REVIEW: This MGS MAG/ER status report covers the period: 28 January to 3 February 2001 (DOY's 28-34) MAG/ER instrument temperatures, currents, and voltages are within nominal ranges. A gif plot of the instrument parameters for the week is located at: http://mgs-mager.gsfc.nasa.gov/status/sr01028-034.html Previous status reports for the magnetometer and electron reflectometer instruments can be selected for viewing at: http://mgs-mager.gsfc.nasa.gov/status/index.html The plotted quantities are: MCP_V-->micro-channel plate voltage A_MA--> controller current A_TEMP-->controller temperature ER_TEMP-->ER temperature IB_TEMP-->inboard temperature OB_TEMP-->outboard temperature No MAG/ER NIPC's were radiated during this period. DOY 29 has a large gap associated with partition 1A7, but according to the DSN status reports, the gap is due to DSN problems. The small gap (~45 min) in DOY 33 is, according to the DSN status reports, due to DSN problems. There are two gaps in DOY 34 (~28 min and ~2.5 hrs), but both of them are unexplained. The larger gap is associated with partition 2A7. $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA
Last Modified: Fri Feb 23 15:56:23 EST 2001
Curator: Monte Kaelberer, Emergent
Email: Monte.S.Kaelberer@gsfc.nasa.gov
Responsible NASA Representative: Mario Acuña
Email: Mario.H.Acuna.1@gsfc.nasa.gov