'
CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR MISSION_NAME = MARS_GLOBAL_SURVEYOR; SPACECRAFT_NAME = MARS_GLOBAL_SURVEYOR; DATA_SET_ID = STATUS_REPORT; FILE_NAME = INSTRPT_MAG_20020415_000000; PRODUCER_ID = MGS_MAG_TEAM; PRODUCER_FULL_NAME = "MONTE KAELBERER, EVER GUANDIQUE"; PRODUCT_CREATION_TIME = 2002-04-15T16:40:00.000; END CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ MAG TEAM REVIEW: This MGS MAG/ER status report covers the period: 7-13 April, 2002 (DOY's 97-103) MAG/ER instrument temperatures, currents, and voltages are within nominal ranges. A gif plot of the instrument parameters for the week is located at: http://mgs-mager.gsfc.nasa.gov/status/sr02097-103.html Previous status reports for the magnetometer and electron reflectometer instruments can be selected for viewing at: http://mgs-mager.gsfc.nasa.gov/status/index.html The plotted quantities are: MCP_V-->micro-channel plate voltage A_MA--> controller current A_TEMP-->controller temperature ER_TEMP-->ER temperature IB_TEMP-->inboard temperature OB_TEMP-->outboard temperature The MAG and ER instruments were turned on at 1522 UTC on DOY 101 (11 April), and the ER software enable patch command was executed at 1809 UTC, DOY 101. With the execution of the patch, the instruments are back to fully operational status. The MCP_V spike is a result of the diagnostics that are done at turnon. According to DSN status reports, the large (~1hr) gap in DOY 103 is due to DSN problems. $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA
Last Modified: Mon Apr 15 12:45:10 EDT 2002
Curator: Monte Kaelberer, L3 Analytics
Email: Monte.S.Kaelberer@gsfc.nasa.gov
Responsible NASA Representative: Mario Acuņa
Email: Mario.H.Acuna.1@gsfc.nasa.gov