'
NASA Logo, Mars Global Surveyor
MGS 
over Olympus Mons, Artwork by Corby Waste; Mars Global Surveyor, 
Magnetic Field Experiment, MAG/ER, GSFC UCB CESR UDBRI NSF UGRAZ 
RICE; cover art of GRL Vol. 28, No. 21 with black background

Mars Global Surveyor Magnetic Field Experiment

Please note: This page contains links to pages outside the nasa.gov domain. [ Disclaimer]

MGS MAG/ER Status Report for Year 2003 DOYs 019-025 Mars Global Surveyor MAG/ER
MGS MAG/ER Investigation Status

MGS MAG/ER Status Report for Year 2003 DOYs 019-025

plots of Volts vs. MCP_V and A_MA, and Degrees C vs IB_TEMP,
OB_TEMP, A_TEMP, and ER_TEMP

CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR
MISSION_NAME          = MARS_GLOBAL_SURVEYOR;
SPACECRAFT_NAME       = MARS_GLOBAL_SURVEYOR;
DATA_SET_ID           = STATUS_REPORT;
FILE_NAME             = INSTRPT_MAG_20030127_000000;
PRODUCER_ID           = MGS_MAG_TEAM;
PRODUCER_FULL_NAME    = "MONTE KAELBERER, EVER GUANDIQUE";
PRODUCT_CREATION_TIME = 2003-01-27T20:15:00.000;
END
CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA
$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
MAG TEAM REVIEW:

This MGS MAG/ER status report covers the period: 
19-25 January 2003 (DOY's 019-025)

MAG/ER instrument temperatures, currents, and voltages are within nominal ranges.

A gif plot of the instrument parameters for the week is located at:
http://mgs-mager.gsfc.nasa.gov/status/sr03019-025.html

Previous status reports for the magnetometer and electron
reflectometer instruments can be selected for viewing at:
http://mgs-mager.gsfc.nasa.gov/status/index.html

The plotted quantities are:
MCP_V-->micro-channel plate voltage
A_MA--> controller current

A_TEMP-->controller temperature
ER_TEMP-->ER temperature
IB_TEMP-->inboard temperature
OB_TEMP-->outboard temperature

There were no MAG/ER commands radiated this period.

The error counter incremented by one on DOY 21. Its cause is being
investigated.

Gaps in DOY 19 are due to a lack of DSN coverage (mapping sequence 246).

According to DSN reports, the small (~45 min) gaps in DOY 21 are due to DSN
problems.

Gaps in DOYs 22 and 24 are unexplained.

According to DSN status reports, the large (~3 hr) gap in DOY 25 is due to DSN
problems.

$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA


Last Modified: Mon Jan 27 15:18:48 EST 2003

Curator: Monte Kaelberer, L-3 Communications EER Corporation
Email: Monte.S.Kaelberer@gsfc.nasa.gov

Responsible NASA Representative: Mario Acuņa
Email: Mario.H.Acuna@nasa.gov

USA.gov Government Made Easy
MGS MAG/ER is an international collaboration by: