'
CCSD3ZS0000111111111NJPL3KS0L015MOMAGDSR MISSION_NAME = MARS_GLOBAL_SURVEYOR; SPACECRAFT_NAME = MARS_GLOBAL_SURVEYOR; DATA_SET_ID = STATUS_REPORT; FILE_NAME = INSTRPT_MAG_20030623_000000; PRODUCER_ID = MGS_MAG_TEAM; PRODUCER_FULL_NAME = "MONTE KAELBERER, EVER GUANDIQUE"; PRODUCT_CREATION_TIME = 2003-06-23T19:20:00.000; END CCSD3RE00000MOMAGDSRNJPL3IS00175GSFCACNA $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ MAG TEAM REVIEW: This MGS MAG/ER status report covers the period: 15-21 June 2003 (DOY's 166-172) MAG/ER instrument temperatures, currents, and voltages are within nominal ranges. A gif plot of the instrument parameters for the week is located at: http://mgs-mager.gsfc.nasa.gov/status/sr03166-172.html Previous status reports for the magnetometer and electron reflectometer instruments can be selected for viewing at: http://mgs-mager.gsfc.nasa.gov/status/index.html The plotted quantities are: MCP_V-->micro-channel plate voltage A_MA--->controller current A_TEMP--->controller temperature ER_TEMP-->ER temperature IB_TEMP-->inboard temperature OB_TEMP-->outboard temperature The MAG and ER instruments were commanded on at 1527 UTC SCET on DOY 169 (18 June 2003). The ER patch enable NIPC was applied at 1829 UTC SCET on DOY 171 (20 June 2003). Gaps up to turn-on on DOY 169 are due to C-mode recovery operations. The large (~4 hr) gap at the end of DOY 172 is due to a lack of data playback (mapping sequence 290). $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ CCSD3RE00000MOMAGDSRCCSD3RE00000GSFCACNA
Last Modified: Mon Jun 23 15:31:01 EDT 2003
Curator: Monte Kaelberer, L-3 Communications EER Corporation
Email: Monte.S.Kaelberer@gsfc.nasa.gov
Responsible NASA Representative: Mario Acuņa
Email: Mario.H.Acuna@nasa.gov